Used podium lorry from the Shamane variety orchestra

camion-podium-16
installation-podium-shamane

Quick installation

The opening of our podium lorry is very fast thanks to its hydraulic system:

Four jacks stabilise the lorry on the ground, then the side panel that serves as our roof is opened, and the stage is lowered. Total time: less than 15 minutes..

At this stage, all that remains is to set up the sound and lighting equipment, then the control room and the instruments...

Quick video (2.48 min) of our installation and uninstallation..

Generator for our podium truck

Our podium truck is equipped with a 40 Kva generator with double soundproofing, so we are completely self-sufficient.

In the photo, it is the black cube behind the three lecterns. The air intake and exhaust are located behind the stage.

We simply need to connect to a 220V socket to get the earth connection.
In the case of concerts in open fields or stadiums, we plant a ground stake in the ground.

camion-podium-face-shamane
camion-podium-face-public-shamane

the concert

Once the setup is complete, all that remains is to play.

Video (2.18 min) from one of our dance evenings.

What next?

Next, as you might expect, we fold up and pack away our equipment, leave the place tidy, and set off.

Off to new adventures!

camion-podium-samane
camion-podium-455-shamane

Specifications of our lorry

Make and modelRenault AE 380
First registration17 June 1992
Odometer reading556 075 km
Vehicle type stated on the registration certificateVASP – véhicule automoteur spécifique
Weight16 tonnes
Transport dimensionsL 10.50 m × W 2.50 m × H 4.10 m
Dimensions with stage deployedL 10.50 m × W 4.50 m × H 4.20 m
Stage deploymentLess than 15 minutes, using a hydraulic system and 4 stabilising jacks.
Energy40 kVA generator set with double soundproofing