Quick installation

The opening of our podium lorry is very fast thanks to its hydraulic system:

Four jacks stabilise the lorry on the ground, then the side panel that serves as our roof is opened, and the stage is lowered. Total time: less than 15 minutes..

At this stage, all that remains is to set up the sound and lighting equipment, then the control room and the instruments...

Quick video (2.48 min) of our installation and uninstallation..

Generator for our podium truck

Our podium truck is equipped with a 40 Kva generator with double soundproofing, so we are completely self-sufficient.

In the photo, it is the black cube behind the three lecterns. The air intake and exhaust are located behind the stage.

We simply need to connect to a 220V socket to get the earth connection.
In the case of concerts in open fields or stadiums, we plant a ground stake in the ground.

camion-podium-face-shamane
camion-podium-face-public-shamane

the concert

Once the setup is complete, all that remains is to play.

Video (2.18 min) from one of our dance evenings.

What next?

Next, as you might expect, we fold up and pack away our equipment, leave the place tidy, and set off.

Off to new adventures!

camion-podium-samane
camion-podium-455-shamane

Dimensions of our lorry


Truck dimensions: L 10.50 m, W 2.50 m, H 4.10 m

Open stage truck L 10.50 m, W 4.50 m, H 4.20 m

Weight 16 tonnes